Astm c31

Some articles have Vimeo videos embedded in them. The bottom layer must be penetrated to the bottom of the mold, and for the layers above it you must go through that layer and about an inch into the layer below it. Don't leave them out there for a week and forget about them or your lab tech is going to be very confused when they look for cylinders to break and find an empty moisture room.

Uploader: Akinogul
Date Added: 15 June 2013
File Size: 45.97 Mb
Operating Systems: Windows NT/2000/XP/2003/2003/7/8/10 MacOS 10/X
Downloads: 93003
Price: Free* [*Free Regsitration Required]





This service allows you to sign up for or associate a Google AdSense account with HubPages, so that you can earn money from ads on your articles.

ASTM C31 / C31M - 18b Standard Practice for Making and Curing Concrete Test Specimens in the Field

Concrete cylinder samples are made for your lab technician to break in a hydraulic press machine and find the compressive strength of the concrete that is being poured for a specific part of a structure. Combining values from asstm two systems may result in non-conformance with the standard. No data is shared with Facebook unless you engage with this feature. When you are picking a place to make your cylinders, make sure it is in a level area that is free of debris, away from vibration, and away from moving vehicles and large construction equipment.

Please choose which areas of our service you consent to our doing so. This is a cloud CDN service aatm we use to efficiently deliver files d31 for our service to operate such as javascript, cascading style sheets, images, and videos.

ASTM C31 / C31M - 00 Standard Practice for Making and Curing Concrete Test Specimens in the Field

You will know when the vibration is done when the surface of the concrete is relatively smooth and air bubbles have stopped coming up to the top surface. When you are doing the last layer, if your mold is underfilled you can add extra concrete to keep it properly filled as you rod.

This is used to detect comment spam. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use. Combining values from the two systems may result in non-conformance with the standard.

Set them on the floor or asmt the table, whichever you prefer, and grab a stripping tool looks like a t-shaped metal bar and a rubber mallet.

Historical V31 s - view previous versions of standard Work Item s - proposed revisions of this standard Translated Version s: Step 2 If you are also doing slump, temperature, and air content on this sample, note that you must have these cylinders made within 15 minutes of receiving the sample, so plan accordingly and set up your work area beforehand ASTM C Paragraph 4.

ASTM C31 - Making and Curing Concrete Test Specimens in the Field

Historical Version s - view previous versions of standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Knowing the time and date will be important for the lab tech to know when to break the cylinders. Sample the concrete in accordance with ASTM C, making sure to mix your concrete sample thoroughly. For both sizes, each layer will be rodded 25 times in an even pattern, asm the holes zstm over the cross-section of the mold.

It is very important for the integrity of any test to have clean, working equipment. For more xstm on managing or withdrawing consents and how we handle data, visit our Privacy Policy at: When transporting cylinders, you will want to make sure they don't bounce around in the truck or fly out, so you should have some cushioned transport racks to hold them in.

All cylinders in a aztm should be started at the same time and have their layers added at the same time you do not add three layers for one and then move on to the next cylinder, they must all have their first layer added and rodded before you move on to layer 2.

You can use this to streamline signing up for, or signing in to your Hubpages account. Strike-off Bar — Must be clean and level and must have a flat and even plane surface. Excessive concrete buildup can be removed from metal scoops and rods by soaking them in vinegar overnight, then washing them off with soap and water and coating them with mineral oil to protect the galvanization.

3c1 provide a better website experience, owlcation. Ours has shelves labeled with a date, and we store them on the day they are meant to be broken, not the day they were made. Unless you are signed in to a HubPages account, all personally identifiable information is anonymized. Ask if all water has been added before you get your sample, and also make sure you get the batch ticket from the driver of the truck, because you will need it later on when you are entering the sample into your computer system or otherwise filling out paperwork.

Active view current version of standard. Please make sure your rods are clean and have a smooth hemispherical tip before use, cc31 specified in ASTM C Be sure to write on your paperwork which location you are making or leaving your cylinders at, because someone else may be the one to come pick them up.

Transportation and Curing Procedures Cylinders need to be picked up anywhere from 18 to 48 hours after they are made.

1 thoughts on “Astm c31”

Leave a Reply

Your email address will not be published. Required fields are marked *